Case study / Commercial / Education and Public Sector
City Fitness, Blenheim.
City Fitness Blenheim is a commercial fitness centre delivered as a full interior fit-out. The scope covered over 1,170 square metres of new gib stopping to Level 4, painting to more than 1,175 square metres of walls, 288 square metres of ceilings, 11 internal doors, and specialist wet area finishes throughout.

The palette.
The palette is built around two main tones: Mid Winter Mist across the gym floor, reception, office, and general circulation areas, and Foundry in the bathrooms, change rooms, and recovery spaces, with City Fitness White to ceilings throughout.
Dry area walls were finished in Dulux Zylone Sheen, wet areas in SpaceCote Low Sheen Kitchen and Bathroom, and all doors and joinery in Lustacryl. Ceiling tiles were sprayed and the ceiling grid painted. Exterior fibre cement cladding was repainted to match the existing finish.
The work.
A project that reflects the planning and sequencing required to deliver a commercial fit-out of this scale cleanly and on programme.


Request a written quote for work like this.