Case study / Commercial / Hospitality

Roki Collection.

Roki Collection, painting works completed.

Roki Collection is a premium hospitality project where the architectural brief asked for a finish that read as part of the design rather than as a layer applied on top of it. Our scope was painting works delivering that refined finish, aligned with the project's design intent and coordinated to the main contractor's programme.

Type
Premium hospitality / accommodation
Scope
Interior painting to penthouse areas and bedroom suites
Region
Queenstown
Materials used
Resene Thorndon Cream to penthouse ceilings, Resene Linen to bedroom walls, Dulux Ohai to bedroom ceilings
Year
2025
Sector
Hospitality
A Roki Collection penthouse lounge, cream ceiling above deep blue walls, opening to Lake Wakatipu and the mountains beyond

The brief.

The architect's intent was singular: a refined, contemporary finish, with the joinery, the walls, and the connecting detail reading as one continuous surface. The specification called for a careful colour palette, hand-cut transitions where surfaces met at architraves and reveals, and a level of finish on plasterboard that read smoothly under directional and ambient hospitality lighting.

Three constraints shaped the work. First, the finish standard. Hospitality interiors under low light show every imperfection that a residential space might forgive. The substrate preparation had to be right before any system rolled out, and the application discipline had to hold across every elevation. Second, the design coordination. The painting was one element in a coordinated design package: joinery, lighting, soft furnishings, signage. The colour and sheen had to match how the rest of the package read in the room. Third, the programme. Coordinated to the main contractor's master programme with windows that respected the trades following us.

The work.

We began with the substrate. The plasterboard was checked for any stopping defects that would carry through under finish coats. Hand-skimming at problem areas. Sanding back to a smooth uniform surface before primer went on. Where the architect's lighting design ran a directional wash down a hero wall, that wall received extra preparation: a tight, low-tolerance finish that would not show ridges or rollers under raking light.

Joinery preparation ran in parallel. Sand, fill, prime, sand back, primer coat, topcoat, hand-cut at the junctions. We protected the joinery during wall application and protected the walls during joinery application. The point of a hospitality interior with this design intent is that nothing looks like it was added later; the painting had to disappear into the architecture.

The system was a specified Resene build, sheen level matched to the architect's intent. Primer, undercoat, and two topcoat applications, applied to the manufacturer's stated dry film thickness. Each coat photographed for the QA pack. The colour matched to a Resene chart code with sample boards applied in the room under the actual lighting before the hero wall was committed.

Coordination with the main contractor was a daily conversation. We worked to windows that gave us a wet edge across an elevation in one shift, with no other trade in the room to cross-contaminate the finish. Where the programme tightened, we adjusted shift starts and finishes rather than compromise the standard.

Hand-cut detail at the architraves, the reveals, and the joinery transitions. Spray application where the brief required a sprayed finish on certain elements; brush and roller where the wall finish wanted the texture of a hand-applied surface. The difference between the two finishes was rehearsed on sample panels before any wall received either.

We worked to the architect's colour and finish schedule, the main contractor's master programme, and the site supervisor's daily reporting expectations. Variations agreed in writing before they happened. Daily site reports across the duration.

The finish.

The painting reads as part of the room. The hero wall holds up under the directional lighting. The joinery transitions are clean enough that a guest's eye does not catch the line. The colour sits as the architect proposed it on the boards, and the sheen reads the same in person as it did in the rendering.

Premium hospitality finishes are quiet by intention. The work that goes into them is loud at the preparation stage and silent at handover. That is the standard the room asked for, and the standard we left it at.